Design verification in R&D stage: Basic function test, long time test, uninterrupted switching test, power failure test, environmental reliability test, EMC test, safety test, compatibility test, data storage test and RDT (Reliability Demonstration Test). Design testing in mass production stage: The ORT Test (on-going Reliability Test) is carried out strictly for the long-term monitoring of mass production quality in order to ensure the consistency of material and production standards during the mass production.
Timely delivery of hazard-free, zero defect, competitive products and services to enhance customer satisfaction.
BIWIN complies with ISO 9001, ISO 14001, IECQ QC 080000, BSCI and other international quality management system certification.